CASE STUDY

Providing Adaptable Jobsite Internet for a Large-Scale Bridge Replacement Project

The Maryland Transportation Authority (MDTA) commissioned a joint venture project to design and build a new bridge across the Potomac River, connecting Newburg, Maryland, and Dahlgren, Virginia, spanning just under two miles. The project involved replacing the two-lane bridge, originally built in 1938, with a modern four-lane structure featuring roadway realignments and an All-Electronic Tolling (AET) system with the goal of providing the public with a wider, safer crossing over the Potomac.

CASE STUDY

How ConstructEdge Designed a Scalable Network to Support Construction Across Two Miles of Open Water

 Client: Global General Contractor | Jobsite: Potomac River Bridge

As planning began, it became clear that maintaining seamless connectivity across the expansive jobsite would be a critical challenge. The construction site spanned nearly two miles of open water, characterized by strong tidal currents and an environmentally sensitive watershed. These factors demanded innovative solutions to ensure reliable communication and data access throughout the project.

With much of the work taking place on the water, tugboats and barges played a vital role in both construction and demolition efforts. These vessels were responsible for transporting materials, supporting land-based crews, and assisting with pile driving and bridge assembly.

Reliable ship-to-shore communication was essential not only for jobsite safety but also for enabling cloud-based project management and design applications. Without a strong and stable connection, workers would be unable to access real-time data, update design specifications, or coordinate effectively with teams on land.