Case Study
Providing Reliable Jobsite Connectivity for a High-Demand Data Center Project
Data center construction projects require high-speed internet connectivity for live communication and real-time access to critical resources, yet they often take place in areas with limited infrastructure, making it a challenge to deploy connectivity into the field and keep pace with the shifting jobsite demands.
Case Study
Field Connectivity Solutions from ConstructEdge Transform Data Center Construction Workflows
Client: ENR Top 50 GC | Jobsite: Northern Alabama Data Center
On a project in northern Alabama, the general contractor, an Engineering News Record Top 50 contractor, sought a connectivity solution that would extend the existing fiber infrastructure at the trailer yard into the field of work. Further, the project owner required all subcontractors, regardless of trade, have secure access to the onsite network to support collaboration and minimize downtime.
ConstructEdge was engaged to assist with the transmission and distribution of high-speed bandwidth across the jobsite, supporting connected devices, live file sharing, and communication platforms critical to project execution.