A CIO should choose a jobsite connectivity vendor on five points: how fast the network is up, how it is secured, who answers when it fails, how many sites one partner can cover, and how the service ends at closeout. Ask for each in writing. The checklist below turns them into questions you can send to any vendor.
Key takeaways
- Ask how soon the site is live and what the vendor needs from you.
- Ask how each trade is kept apart on the network and who manages the firewall.
- Ask who answers when the network fails, and get the response time in writing.
- Ask if one partner can cover every site with the same standard.
- Ask who turns services off at closeout so billing stops.
What makes jobsite connectivity different from office IT
Jobsite connectivity is temporary and moves with the work. A new site often starts with no wired network, and many trades share it. A vendor that only knows office IT will plan for a building that does not exist yet.
The 5-point vendor checklist
- Setup speed. Ask how soon the site is live and what the vendor needs from you, such as address, power and access. Ask for the plan, not a promise.
- Security. Ask how trades are kept on separate networks, who manages the firewall, how patching works, and what access control and logging are in place. Tie each answer to the security standard your company already asks for.
- Support and response. Ask for hours, how an alert reaches a person, and what “response” means in writing.
- Coverage and multi-site. Ask if the vendor covers trailers, the field and whole-site Wi-Fi, and if one standard works across all your sites.
- Lifecycle and closeout. Ask who installs, who manages and who decommissions the network, and who turns services off so billing stops.
Connection types compared
| Connection | Best for | Weak point | Setup effort |
|---|---|---|---|
| Starlink | Remote sites with no wired service. | Needs a clear sky view, and the satellite link can drop; cellular failover on the router covers it. | Quicker to get on a job site than DIA. Field technicians install the antennas and routers. |
| Cellular | Fast setup, or a backup connection. | Suits shorter projects or backup rather than long builds. | Easier to get than DIA or broadband, which need infrastructure and take more time. |
| Dedicated internet (DIA) / fiber | Large projects that need a dedicated connection over fiber or a wireless ISP. | Needs infrastructure at the site and takes more time to get. | Plan it early, in the first phase (greenfield and setup). |
| Private LTE | Broad coverage across large sites and work zones; video, BIM and IoT traffic. | Needs a design for the specific site; Wi-Fi can have lower ongoing cost for smaller zones. | Dedicated equipment sized to the project, managed from setup to closeout. |
| Managed Wi-Fi | Long builds; coverage across trailers, laydown yards and work zones. | Concrete, steel and moving equipment affect coverage; access points are reviewed as work progresses. | Designed from the site layout; design, deploy, manage and decommission are handled for you. |
Questions to put in your RFP
Setup speed
- What is the plan from signed order to a live site, and what do you need from us?
- What do you do if we need the site live before the work starts?
Security
- How are trades separated on the network?
- Who manages the firewall, and how are patches applied?
- What access control and logging do you provide?
Support and response
- Who answers when the network fails, and how does an alert reach that person?
- What response time do you give in writing?
Coverage and multi-site
- Can you cover every site we run with one standard?
- Which connection types do you offer, and do you pick by site?
Closeout
- Who decommissions the network, and when does billing stop?
Red flags
- No written response time.
- Only one connection type on offer.
- No decommission plan.
- Cannot cover more than one site.
- One flat network shared by all trades.
- No named owner for the service.
How ConstructEdge answers the checklist
ConstructEdge is one partner that manages the whole jobsite network: internet, trailer network, field connectivity, and security. It works as the general contractor of technology for your job site, so you deal with one company. The service follows the job: design, deploy, manage and decommission, and ConstructEdge turns every service off at closeout so the customer pays no extra bills. Company-reported: 2,000+ installed jobsites and 2,400 ISP partners, with 24/7 network monitoring. Contact is answered within one business day. See our connected jobsite solutions or contact us for a quote.
FAQ
How should a CIO choose a vendor for temporary jobsite connectivity?
Choose on five points: setup speed, security, support and response, coverage across sites, and closeout. Ask each vendor for written answers to all five. Compare the answers side by side. A vendor that cannot answer one in writing is a risk on that point.
What should a jobsite connectivity contract include?
It should state the response time in writing, the scope for each site, who owns the equipment, and how the service is decommissioned. It should say when billing stops at closeout. Ask for the monitoring and alert steps in the contract too.
How do I standardize network security across many jobsites?
Use one security baseline, one managed partner and the same checklist at every site. Ask the partner to apply the same trade separation, firewall management and logging each time. Review the result per site, not once for the whole portfolio.
Should we use Starlink, cellular or a managed network on a jobsite?
It depends on the site and the phase. Each fits different needs; see Starlink and connected jobsite solutions. A managed partner can combine them and pick per site. Starlink suits remote sites with no wired service, cellular suits fast setup or backup, and Wi-Fi suits long builds.
Who is responsible when jobsite internet goes down?
Ask for a named owner and a written response time before you sign. With one managed partner, one company answers for the whole network. With several vendors, the contract must say who acts first.
What happens to the network at the end of the project?
The vendor decommissions it. ConstructEdge turns off every service at closeout, so the customer pays no extra bills. Ask any vendor to confirm this step and the date billing stops.




